Fig. 3
From: Inferring the energy cost of resistance to parasitic infection and its link to a trade-off

Workflow of the model parameter estimation. Grey box indicates the two steps of individual parameter estimation (1.1 and 1.2). Step (2) iterates the process 100 times to determine the optimal values of energy costs of immunity against Haemonchus contortus infection. See Table 1 for parameter definition